| Sign In | Join Free | My xpandrally.com |
|
Brand Name : Shenghong
Model Number : SH16-06-05-06
Certification : ISO9001 and CE
Place of Origin : China, Jiangsu
MOQ : 1 sets
Price : Negotiation
Payment Terms : T/T
Supply Ability : 30 SETS/ MONTH
Delivery Time : 40 days after payment
Packaging Details : Container
Material of rollers : 45# steel
Production Capacity : 8-12m/min
Power(W) : 7.5KW
Roller Material : GCr15
Cutting Power : 5.5kw
Drawing for you reference:

| Suitable material | Steel with 1.2-1.5mm |
| Main roller station | 18 groups |
| Straighting rollers | 5 groups |
| Motor power | 7.5KW |
| Reduce type | 250# |
| Shaft diameter | Φ70mm |
| Shaft material | 45# forging Steel |
| Roller material | GCr15 |
| Roller treatment | Vacuum hardening & Polished |
| Galvanization | 0.05mm |
| Processing speed | 8-12m/min |
| Chain size | 1.2inch |
| PLC Brand | SIEMENS |
| Frequency Changer | SANJING |
| Electrical element | Schneider |
| Touch screen | Touch-win |
| Fuse protector | Schneider |
| Control transformer | Schneider |
| Voltage standard | 380V50Hz |
| Hydraulic Pump Station | 1 SET |
| Pump Motor Power | 5.5KW |
| Cutting mold material | Cr12 |
| Length Cutting Tolerance | +/-1.5mm |
The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)
|
|
Shutter Cold Roll Forming Machine / Door Frame Roll Forming Machine Images |